ACE Straight Valve, Shut-Off, Quarter Turn

1 valve


 

Directions

Instructions: 1. Turn off water supply leading to work area. 2. Open faucet or flush toilet to remove water existing in line. 3. Remove old valve and any old solder or compression nut/sleeve. 4. Slide flange over copper stub-out. 5. Slide compression nut followed by the sleeve onto stub-out. 6. Place shut off valve onto stub-out. Tighten compression nut to valve. Required torque is approximately 1/2 turn after the nut begins to take hold or bite into tube. 7. Position valve outlet to receive supply line or tube and attach to valve. 8. Turn on water to work area and test installation before leaving job site.

 

Product Details

Outlet: 3/8 inch OD. Inlet: 3/8 inch FIP. Quality since 1924. Corrosion resistant brass ball. This product contains less than 0.25% weighted average lead content on wet surface Ace Promise: Satisfaction guaranteed. www.acehardware.com. Made in China.

Nutrition Facts

Warnings

Cancer and reproductive harm - www.P65Warnings.ca.gov.

Manufacturer

ACE HARDWARE
Oak Brook, IL 60523 USA

UPC

00082901247012