ACE Straight Valve 1 ea BLISTER PACK
On This Page
Directions
Instructions: 1. Turn off water supply leading to work area. 2. Open faucet or flush toilet to remove water existing in line. 3. Remove old valve and any old solder or compression nut/sleeve. 4. Slide flange over copper stub-out. 5. Slide compression nut followed by the sleeve onto stub-out. 6. Place shut off valve onto stub-out. Tighten compression nut to valve. Required torque is approximately 1/2 turn after the nut begins to take hold or bite into tube. 7. Position valve outlet to receive supply line or tube and attach to valve. 8. Turn on water to work area and test installation before leaving job site.
Description
Outlet: 3/8 inch OD. Inlet: 3/8 inch FIP. Quality since 1924. Corrosion resistant brass ball. This product contains less than 0.25% weighted average lead content on wet surfaceWarnings
Cancer and reproductive harm - www.P65Warnings.ca.gov.UPC
00082901247012