ACE Straight Valve 1 ea BLISTER PACK


 

Directions

Instructions: 1. Turn off water supply leading to work area. 2. Open faucet or flush toilet to remove water existing in line. 3. Remove old valve. 4. Slide flange over nipple to wall. 5. Apply pipe thread compound or thread seal tape to the nipple's threads. 6. Tighten female-threaded connection of shut-off valve onto nipple. 7. Position valve outlet to receive supply line or tube and attach to valve. 8. Turn on water to work area and test installation before leaving job site 1. Turn off water supply leading to work area. 2. Open faucet or flush toilet to remove water existing in line. 3. Remove old valve. 4. Slide flange over nipple to wall. 5. Apply pipe thread compound or thread seal tape to the nipple's threads. 6. Tighten female-threaded connection of shut-off valve onto nipple. 7. Position valve outlet to receive supply line or tube and attach to valve. 8. Turn on water to work area and test installation before leaving job site.

 

Description

Outlet: 1/2 inch OD. Inlet: 1/2 inch FIP. Quality since 1924. Corrosion resistant brass ball. This product contains less than 0.25% weighted average lead content on wet surfaces.

Warnings

Cancer and reproductive harm - www.P65Warnings.ca.gov.

UPC

00082901247050